*Registration Closes October 27 at 5pm MST*

Identifying and Tapping the Potential of Industry 4.0

Intel Talk Overview

The study “Panel building 4.0“ by the Institute for Control Engineering of Machine Tools and Manufacturing Units of the University of Stuttgart shows that the most time-consuming phases in classic panel building are planning and installation.

More precisely: The steps of project planning and circuit diagram construction account for more than 50% of the time spent on the entire planning process. During installation, the complex combination of manual processes usually required for mechanical assembly and wiring accounts for over 70% of the time spent on the assembly process! We will review the study and share what steps and practices can be taken to improve your production.

Speaker

Allen Brennan
Application Specialist, Weidmueller


August 28, 2020

2020 Networking Happy Hour Goes Virtual!

> Read More

August 25, 2020

2020 Top 5 Innovations!

> Read More
  • presented by
  • sponsored by
  • Beamex Canada DK-LOK Canada Ltd. CSA Group Spartan Controls PAS Verve Industrial Protection PAS 2 Tridon Atmos International New Technology Track Schneider Electric Rockwell Automation Festo Verve Industrial Protection 2 UL Canada The Quarry Westech Industrial Summit Valve & Controls Weidmuller Swagelok / Edmonton Valve & Fitting Process Control Solutions
Register Now